108 Sq km
Size of Current Project Area
17.6%
Total Heavy Minerals (THM)
90%
THM Recoveries
17.2 Mt
Initial JORC Resource
75%
Valuable Heavy Minerals
300+
New Jobs Created
>$200m
Royalties and Taxes for Sri Lanka
Grade is Truly King
17.6% THM grade sets project apart from typical 2-5% mineral sands projects, driving increased value and efficiency.
Grade of this magnitude drives:
Grade of this magnitude drives:
- Simplicity
- Lower CAPEX
- Lower OPEX
- Higher plant recovery and grades
- Reduced environmental footprint
Mine & Plant Construction
- 2 Initial Industrial Mining Licences issued, additional applications advancing
- Mineral Technologies and Access Group supporting engineering/design
- Mineral Technologies to supply ‘off the shelf’ Flex Series Wet Concentrator Plant
Clear Development Strategy
- Targeting production of 125,000tpa of Heavy Mineral Concentrate for stage 1
- Stage 1 capex just US$17.7 million to become self-funding
- Project funding advancing – debt/equity; strategic industry investors and offtakers
- Mineral Separation Plant concept study with Mineral Technologies complete for potential acceleration of the MSP stage
Resource Upside
- 2025 drilling confirmed consistent high grades and a 3.2x mineralisation surface area increase in the Initial Mining Area alone
- 15x increase in Mineral Resource Estimate tonnes for the Initial Mining Area
- Further increases expected through ongoing drilling programmes
Physical mining and processing only – no blasting, no chemicals, continuous rehabilitation.