Our Taprobane Minerals Project has one of the highest in-situ grades globally and represents Sri Lanka’s most advanced mineral sands development project.

Learn more about the project, extraction process and environmental stewardship.

108 Sq km

Size of Current Project Area

17.6%

Total Heavy Minerals (THM)

90%

THM Recoveries

17.2 Mt

Initial JORC Resource

75%

Valuable Heavy Minerals

300+

New Jobs Created

>$200m

Royalties and Taxes for Sri Lanka

Grade is Truly King

17.6% THM grade sets project apart from typical 2-5% mineral sands projects, driving increased value and efficiency.
Grade of this magnitude drives:

  • Simplicity
  • Lower CAPEX
  • Lower OPEX
  • Higher plant recovery and grades
  • Reduced environmental footprint

Mine & Plant Construction

  • 2 Initial Industrial Mining Licences issued, additional applications advancing
  • Mineral Technologies and Access Group supporting engineering/design
  • Mineral Technologies to supply ‘off the shelf’ Flex Series Wet Concentrator Plant

Clear Development Strategy

  • Targeting production of 125,000tpa of Heavy Mineral Concentrate for stage 1
  • Stage 1 capex just US$17.7 million to become self-funding
  • Project funding advancing – debt/equity; strategic industry investors and offtakers
  • Mineral Separation Plant concept study with Mineral Technologies complete for potential acceleration of the MSP stage

Resource Upside

  • 2025 drilling confirmed consistent high grades and a 3.2x mineralisation surface area increase in the Initial Mining Area alone
  • 15x increase in Mineral Resource Estimate tonnes for the Initial Mining Area
  • Further increases expected through ongoing drilling programmes

Physical mining and processing only – no blasting, no chemicals, continuous rehabilitation.

3D model for Wet Concentrator Plant